Cisco Systems IEM30004PC Instalační manuál Strana 41

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 170
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 40
2-15
Cisco IE 3000 Switch Hardware Installation Guide
OL-13017-01
Chapter 2 Switch Installation
Verifying Switch Operation
Figure 2-10 Crimping the Ring Terminal
Step 4 Slide the ground screw through the ring terminal.
Step 5 Insert the ground screw into the functional ground screw opening on the front panel.
Step 6 Use a ratcheting torque screwdriver to tighten the ground screw and ring terminal lug to the switch front
panel to 8.5 in-lb. The torque should not exceed 8.5 in-lb. See
Figure 2-11.
Figure 2-11 Torquing Ground-Lug Screws
Step 7 Attach the other end of the ground wire to a grounded bare metal surface, such as a ground bus, a
grounded DIN rail, or a grounded bare rack.
76666
1 Ground cable
1
201696
Zobrazit stránku 40
1 2 ... 36 37 38 39 40 41 42 43 44 45 46 ... 169 170

Komentáře k této Příručce

Žádné komentáře