Cisco Systems XR 12410 Instalační manuál Strana 159

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 230
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 158
4-35
Cisco XR 12410 Router Installation Guide
OL-13832-01
Chapter 4 Troubleshooting the Installation
Troubleshooting the Cooling Subsystem
Troubleshooting the Cooling Subsystem
You may need to troubleshoot the cooling subsystem if an overtemperature
condition occurs. The cooling subsystem of the router consists of a blower module
in the chassis and a fan in each of the power supplies. The blower module and the
power supply fans circulate air to maintain acceptable operating temperatures
within the router (
Figure 4-10).
This section contains information to troubleshooting the cooling subsystem and
includes:
Blower Module Operation, page 4-36
Power Supply Operation, page 4-36
Overtemperature Conditions, page 4-37
Isolating Cooling Subsystem Problems, page 4-38
Figure 4-10 Cooling Air Flow
Air exhaust
Line card and RP card cage
Room air
Air filter
Switch fabric card cage
Blower module
Power supplies
50396
Zobrazit stránku 158
1 2 ... 154 155 156 157 158 159 160 161 162 163 164 ... 229 230

Komentáře k této Příručce

Žádné komentáře